Mill Test Certificates: EN 10204 3.1 vs 3.2 and How to Read an MTC

Published November 2026  ·  9 min read  ·  Buyer's Guide  ·  Quality & Documentation

A mill test certificate (MTC) is the passport of a steel product. It proves the grade, records the chemical composition and mechanical test results, and links the delivered material to the heat it was made from. For CE-marked structures, pressure equipment and most industrial projects, the steel cannot be used without it. This guide explains the EN 10204 document types, the difference between a 3.1 and a 3.2 certificate, how to read an MTC line by line, and how to spot a certificate that should not be accepted.

Quick answers
• EN 10204 defines four types of inspection documents for metallic products: 2.1, 2.2, 3.1 and 3.2.
• 3.1: test results of the actual delivered product, validated by the manufacturer's inspection representative, who is independent of production. This is the standard for structural steel.
• 3.2: the same, but validated also by the purchaser's representative or an independent inspector (e.g. TÜV, BV, LR, DNV).
• The key to traceability is the heat (cast) number, which must match the marking on the material.

The Four EN 10204 Document Types

TypeNameWhat it containsValidated byTypical use
2.1Declaration of compliance with the orderStatement that the products comply, without test resultsManufacturerNon-critical items, consumables
2.2Test reportStatement of compliance with results of non-specific inspection (typical values from the same production process)ManufacturerCommercial products, fasteners, general engineering
3.1Inspection certificate 3.1Results of specific inspection on the delivered products or the test unit they belong toManufacturer's authorised inspection representative, independent of the manufacturing departmentStructural steel, plates, tubes, flanges, most industrial projects
3.2Inspection certificate 3.2Results of specific inspection, as for 3.1Manufacturer's inspection representative and the purchaser's authorised representative or an inspector named in official regulationsPressure equipment, offshore, nuclear, critical structures, when required by the client

The current edition is EN 10204:2004. Older documents may refer to the 1991 edition, where "3.1.B" corresponds to today's 3.1, and "3.1.A", "3.1.C" and "3.2" broadly correspond to today's 3.2. Contracts that still ask for "3.1.B" are usually satisfied by a 3.1 certificate, but confirm it in writing.

3.1 vs 3.2: Which One Do You Need?

3.13.2
Who signsMill's own quality inspectorMill's inspector plus an external inspector
WitnessingNo external witnessExternal inspector witnesses sampling and testing, or reviews them
CostIncluded in the priceExtra cost for the inspection body, usually charged per visit or per tonne
Lead timeNo delayTesting must be scheduled with the inspector, which can add days
When requiredEN 1090 structures, most construction and machinery projectsPressure equipment of higher categories, offshore and marine projects, nuclear, or when the client specification demands it
Specify it early: A 3.2 certificate must be planned before production or testing. It is rarely possible to "upgrade" a 3.1 to a 3.2 once the material is in stock, unless retesting is done in the presence of the inspector. State the document type and the inspection body in the purchase order.

How to Read a Mill Test Certificate

MTC layouts differ between mills, but every certificate contains the same blocks of information.

1. Header

  • Manufacturer name and address (the mill, not a trader)
  • Certificate number and date
  • Document type: "Inspection certificate EN 10204 3.1"
  • Customer, purchase order number and delivery note number

2. Product description

  • Product standard and grade, for example EN 10025-2 S355J2+AR or EN 10219 S355J2H
  • Dimensions, quantity (pieces, bundles) and weight
  • Delivery condition: +AR as rolled, +N normalised or normalised rolled, +M thermomechanically rolled

3. Heat (cast) number

The heat number identifies the batch of steel from one melt. It must appear on the certificate and on the material itself, stamped, painted or on a label. If you cannot match the two, the certificate does not prove anything about the steel in front of you. The heat number is also how you trace the melt-and-pour origin required under the new EU steel import rules.

4. Chemical composition (ladle analysis)

The percentage of each element, usually C, Si, Mn, P, S, Cu, Cr, Ni, Mo, V, Nb, Ti, Al, N and sometimes B. Check each value against the maximum in the product standard. The carbon equivalent value (CEV) is often printed too. It shows how easily the steel can be welded:

CEV = C + Mn/6 + (Cr + Mo + V)/5 + (Ni + Cu)/15

5. Mechanical properties

  • Yield strength (ReH or Rp0.2) in MPa: must be at least the grade minimum for that thickness, for example 355 MPa for S355 up to 16 mm.
  • Tensile strength (Rm) in MPa: must be within the range, for example 470–630 MPa for S355 from 3 to 100 mm.
  • Elongation (A or A5) in %: must meet the minimum.
  • Impact energy (Charpy KV) in joules at the test temperature: for a J2 grade, at least 27 J at −20 °C. Check that the temperature matches the grade (JR +20 °C, J0 0 °C, J2 −20 °C, K2 −20 °C with 40 J).

6. Other tests and statements

Depending on the product: ultrasonic testing of plates (EN 10160), through-thickness properties (Z15, Z25, Z35), hardness, bend tests, hydrostatic tests for tubes, coating mass for galvanized steel, and dimensional inspection. The certificate ends with a statement that the products comply with the order, and the name, signature or stamp of the inspection representative.

CEV Check: Is the Steel Weldable?

Enter the values from your certificate to calculate the carbon equivalent and compare it with the EN 10025-2 maximum for the grade and thickness.

Maximum CEV values according to EN 10025-2 (ladle analysis, thickness up to 150 mm). A higher CEV does not make the steel unusable, but it may need preheating and a qualified welding procedure. Always check the edition of the standard named in your contract.

Red Flags: Certificates You Should Question

  • The heat number does not match the marking on the material, or the material is not marked at all.
  • The certificate is issued by a trader instead of the mill. A stockist may pass on the mill's certificate, but it must not create its own "3.1" for properties it did not test.
  • Identical values on certificates for different heats or orders. Real test results vary.
  • Values exactly at the limit for every property, or results that fail the standard.
  • Missing impact test for a J0, J2 or K2 grade, or a test temperature that does not match the grade.
  • Wrong document type: a 2.2 test report where a 3.1 was ordered.
  • Edited documents: different fonts, misaligned figures or a missing certificate number.
  • Grade "upgraded" on paper, for example S235 material re-certified as S355 without new tests.

If in doubt, send the certificate number to the mill and ask it to confirm. Many large mills now offer online certificate verification. For critical work, independent retesting of a sample in an accredited laboratory costs little compared with the risk.

Practical Tips for Buyers

  • State the document type in the purchase order: "Inspection certificate EN 10204 3.1" or "3.2, witnessed by [inspection body]".
  • Ask for the certificate before shipment, and check it before the goods leave the mill.
  • Require heat number marking on every piece or bundle.
  • Keep the certificates with your project files. EN 1090 and pressure equipment rules require traceability for years after delivery.
  • For processed products (cut, galvanized, fabricated), ask for the original mill certificate plus the processor's own certificate or declaration.
  • Use the same data for CBAM: the producing installation and heat details are needed for your CBAM emissions reporting.

Certificates for Steel from Türkiye

Turkish mills issue EN 10204 3.1 certificates in English as standard for structural sections, plates, coils, tubes and bars, and many provide digital certificates that can be verified online. For 3.2 certificates, international inspection bodies such as TÜV, Bureau Veritas, Lloyd's Register, DNV and SGS are present in all major Turkish industrial regions, so witnessing can be arranged quickly.

Steeling.net checks the certificates of every order against the purchase order and the product standard before shipment, and can arrange third-party inspection when you need a 3.2 certificate. Read how to choose a reliable metal supplier and our guide to the metal procurement process.

Frequently Asked Questions

What is the difference between EN 10204 3.1 and 3.2?

Both contain the test results of the actual delivered products. A 3.1 certificate is validated only by the manufacturer's authorised inspection representative, who is independent of production. A 3.2 certificate is also validated by the purchaser's representative or an independent inspector named in official regulations.

What is a mill test certificate?

A mill test certificate (MTC), also called a material test report (MTR), is a document issued by the steel producer that certifies the grade, chemical composition and mechanical properties of a specific batch of steel, identified by its heat number.

Is a 3.1 certificate enough for EN 1090 structural steel?

In most cases, yes. Structural steel products for EN 1090 execution classes are normally supplied with EN 10204 3.1 inspection certificates. Some project specifications or higher execution classes may require additional checks or a 3.2 certificate.

What is the old 3.1.B certificate?

3.1.B is the designation from the 1991 edition of EN 10204. It corresponds to the 3.1 inspection certificate in the current 2004 edition.

What is the heat number on a steel certificate?

The heat or cast number identifies the batch of steel from one melt. It appears on the certificate and on the material, and it links the delivered steel to its chemical analysis and test results.

What is the maximum CEV for S355?

Under EN 10025-2, the maximum carbon equivalent (CEV) for S355 is 0.45 for thicknesses up to 30 mm and 0.47 for thicknesses above 30 mm, based on the ladle analysis.